We'll inspect all raw materials, and testing the light source before making lights
Installing bulbs or led strips, gluing, putting crystals and accessories, connecting cables
The QC inspector will run a 3 hrs testing. During the testing, the testing machine simulates the real scene of switch on-off operation on 10,000 times
A very important thing we do is to pack lights in an anti-humidity and anti-dust film before packing in a standard export carton box